News & Announcement
Inter departmental team led by DC Soreng inspect the drainage system of Soreng
Soreng, July 19 (IPR): Today, a team led by Mr Dhiraj Subedi District Collector Soreng comprising of district officials conducted a joint inspection of the proposed drainage system of Jautar and peripheral areas of Soreng connecting Ranikhola under Soreng district.
The DC was accompanied by Mr DR Bista ADC (Soreng), Mr Gaayas Pega ADC (Dev), Mr Sunny Kharel SDM (Soreng), Mr Tara Subba SE Roads, Mr SK Sharma BDO (Soreng) and Officers from Buildings, Water Resources, Sports, Power, RDD and other related departments.
The inspection commenced from Jautar ground, which aimed at a thorough view of the drainage system from Jautar ground connecting Ranikhola that has to be refurbished.
The team, along its route to Ranikhola inspected the roadside drainage system which covered various vulnerable areas of Soreng.
During the inspection, the DC ascertained the drainage system’s condition that has to be maintained adequately. The drainage system over some sections of the existing drain along the route has to be improvised as an added measure, the DC advised. He further suggested adopting a systematic approach to intervention wherever required. The concerned department heads were given the necessary direction to work as a team and prepare a draft plan within two weeks.
The DC was accompanied by Mr DR Bista ADC (Soreng), Mr Gaayas Pega ADC (Dev), Mr Sunny Kharel SDM (Soreng), Mr Tara Subba SE Roads, Mr SK Sharma BDO (Soreng) and Officers from Buildings, Water Resources, Sports, Power, RDD and other related departments.
The inspection commenced from Jautar ground, which aimed at a thorough view of the drainage system from Jautar ground connecting Ranikhola that has to be refurbished.
The team, along its route to Ranikhola inspected the roadside drainage system which covered various vulnerable areas of Soreng.
During the inspection, the DC ascertained the drainage system’s condition that has to be maintained adequately. The drainage system over some sections of the existing drain along the route has to be improvised as an added measure, the DC advised. He further suggested adopting a systematic approach to intervention wherever required. The concerned department heads were given the necessary direction to work as a team and prepare a draft plan within two weeks.
