Date: 25 June-2024 (06:17 AM)
Road sitrep- 25/06/2024
Pakyong Sub-Division
1.Latuk Thek to Rolep Road closed.
2.Rest all other roads are trafficable as of now, except some Fair Weather Roads.
Singtam Sub-Division
1.All the roads under Singtam SD is clear for traffic.
Mangan Sub-Division
1.Connectivity to Upper Dzongu cutoff due to bridge (GREF) at Sangkalang damaged and DSM road open upto Gnon village and remaining stretch upto Sangkalang blocked due to landslides at multiple locations.
2.Gor-Taryang road blocked due to landslides at multiple locations.
3.Phidang Sangtok road blocked due to massive slips and presently unable to clear.
4.Zimchung Nampatam road blocked due to formation damage approx 70 metres length at km1 Ch 33.Restoration presently not possible
5.No Connectivity between Mangan and Chungthang due to major damages/blockages at Lanthey khola, Rel chu and near Theng tunnel.
6.Rest all roads open except FWRs n New Cutting roads which have been affected by landslides.
7.Mangan to Gangtok via Rakdung-Tintek road is clear.
8.Mangan to Gangtok via Phodong Road is clear for light vehicles
9.Mangan-Chungthang via Toong Naga route blocked at multiple places.
10.Mangan to Chungthang road via Sangkalang road is blocked at Multiple places.
11.Lachen to Chungthang road is blocked at Munsithang.
12.Lachen to Thangu blocked at Zeema-1.
13.Thangu-Gurudongmar is open.
14.Chunthang to Lachung is clear.
15.Lachung to Yumthang is clear.
16.Mangan to Dikchu road is clear.
Soreng Sub-division
1.All roads are open for traffic under Soreng SD.
Jorethang Sub-Division.
1.All roads under Jorethang sub division is open, except Approach road to Melli bazar open for LMV only and some FWRs.
Namchi Sub-divison.
1.All the road under Namchi Sub Division are open except Phongla Bermiok road, which is blocked at km 13-14 (Beathghari).
Roads under ABD
1.Kitam fatak to Joerthang road is open as of now (SH-19).
2.Jorethang to Namchi road is open as of now (SH-20).
Yangang Sub-division
1.Kimbubotey Sokpey road is block at kaw khola. The restoration work is under progress.
2.Ravangla to yangang road is block at pathing slide.
3.Satam Samruk to Gangla road is block at Km 3rd Ch-1 Rangpo khola (Steel bridge collapsed)
4.Yangang Makha road is open for only LMV.
5.Rest of the road is open as of now excepts some of FWRs
Daramdin Sub-division
1.All roads are trafficable under Daramdin SD.
Kaluk Sub-division
1.All roads are trafficable under kaluk sub division.
Rabong Sub-division
1.Road blocked at km 8 Ch 10-11 and km 8 Ch 13-14 due to formation wash out along 10th Mile Turning to Sagbari via Tingmoo Village road..Men and machineries have been deployed.
2.Road blocked due to multiple major and minor slips at km 24 ch 22, km 24 Ch 29, km25 Ch 30, km 26 Ch 1-4, km 27 ch 6 and formation washed out at km 25 Ch 30 along Ralong Phamtam to Rangit River road…Men and machineries have been deployed.
3.Rest of the roads under Rabong Sub Division are open as of now except some FWR’s.
Gyalshing Sub-Division
1.Chongrang kongri Labdang road: Blocked at km 17 ch no 21-22.
2.Teshangthang-shyangkhola road blocked at km 2 ch 13 due to formation washout .
3.Along Gyalshing-Sakyong road is blocked by fallen tree and it will be removed soon.
4.Rest all the road are open except some of the FWRs.
Gangtok Sub-Division
1.At km 1st ch 11th (near Mahindra workshop) & at km 2nd ch 20th (near NH Bifurcation) along GRS Road is open for light vehicular movement only as immediate restoration works is ongoing.
2.At Bhusuk -14 mile along GRBA Road , due to break open of the water pipeline of M/s Hanuman Ganga has led to the overflow of water on the road , however road is open for traffic.
Rongli Sub-Division
1.Duga Chewribotey Road blocked at Km 2nd Ch28th.
2.Rest all other roads are trafficable as of now, except some Fair Weather Roads.
Dentam Sub-Division
1.All roads clear under Dentam SD.
Date: 25th August-2023 (05:38 AM)
Road sitrep- 25/08/2023
Kaluk Sub-divison
1.Reshi Rinchenpong road blocked at Nawley bhir and Nawlay kholsa at 11km ch 1 and 11 km ch 1.
2.Bermiok legship road blocked at 1st km ch 22, 8th km ch 33, 13th km chb19, 12 km ch 11, slip occurred at several stretches along reshi kamling road.
3.Rest all roads are open with minor slips.
Gyalshing Sub-Division
1.Teshangthang-shyangkhola toad blocked at Km 2 ch 13 due formation washout.
2.Tashiding to Legship road blocked at Gundrukey km 10 to 17 ch 25.
3.Gyalshing-Tikjuk (shot cut) blocked at Km 1 ch 14.
4.Legsip-Gyalshing road blocked at Km 7 ch 11.
5.Rest all the road are open except some of the FWRs.
Singtam Sub-Division
1.All the roads under Singtam Sub-division are clear and trafficable.
Namchi Sub-Division
1.Namchi Phongla Namthang Mamring open.
2.Phongla Bermoik road blocked at km 13-14 (Beathghari).
3.Chuba Perbing road open with minor slips.
4.Namchi Vok sikkip road open with minor slips.
5.Namchi Rong Sumbuk open with minor slips.
6.Namchi Kopchey Singithang open.
7.NamchI to Assangthang open.
8.Assangthang to Dhargoan open.
9.Namchi Kitam Manpur road blockedat km 1st Ch 30.
Jorethang Sub-Division
1.All roads under Jorethang Sub-Division are clear for vehicular movement except few FWRs.
Daramdin Sub-Division
1.NDP road blocked at bojeck slide due to slushy surface and muddy slips .
2.Soreng Sombaria road blocked at Rumbuk km 17th due to fallen tree which has hit the power line.
3.Sombaria Piureytar road is trafficable for LMV only due to the rise in water level at Tam khola.
4.Sombaria Hilley road blocked at Anden Km 6th due to fallen boulders.
5.Bojeck Diversion Road at Sumphu khola is trafficable for LMV due to the rise in water level of Sumphu khola .
6.Rest all roads are trafficable despite several minor and major slips, which will be clear by engaging machine and labours.
Ravangla Sub-Division
1.Road blocked at Km 13 Ch 16 Biring Khosla and Km 13 Ch 26-27-28 along 10th Mile Turning to Sagbari via Tingmoo Village road…Men and machineries shall be deployed ASAP.
2.Road blocked at Km 12 Ch 2 along Rayong Tinkitam road…Men and machineries shall be deployed ASAP.
Yangang Sub-Division
1.Slips has occurred at several locations along Pabong Simchuthang Yangang But road is trafficable for L.M.V till now.
2.Paiyong JHS road is blocked 1st k.m ch 12 ,13 and 7 . Machine has been engaged for immediate traffic clearance.
3.Rabongla yangang road is blocked at pathing .
4.Rest all the roads are open as of now except some of F.W.R.
Dentam Sub-Division
1.Pelling-Dentam blocked at Km-12,Ch-26 at Lungzik due to sludge,fallen boulders and heavy runoff at the roadway .The water can’t be diverted downward as there are private households residing which are already in danger due to days back flashflood/landslide.However man & machinery will be engaged for clearance.
2.Rest all clear as of now .
Rongli Sub-Division
1.Bank Dara to Posokey Road Blocked at 1st km.
2.Rolep power House to Navarey Gaon road formation washed out at 1st km.
3.All other roads are trafficable as of now except some FWR.
Pakyong Sub Division
1.Assamlingzey to Pakyong road blocked at KM 23 Ch 15 Rongrong khola.
2.Latuk Thek to Rolep Road closed.
3.Taksang PMGSY road to Koirala Gaon road closed at KM 1,ch 14. Restoration work under progress.
4.Rest all other roads are trafficable as of now, except some Fair Weather Roads.
Soreng Sub-Division
1.NDP Road km 1st to Soreng via Zoom Road is blocked Km 7th Ch-22.
2.Chakung Khaniserbong road is blocked at KM 3rd Ch-23.
3.NDP Road Km 8th to Chakung via Chumbung road blocked at Km 3rd Ch-17. Rest all the roads are open for traffic.
Mangan Sub-Division
1.Phidang sangtok road blocked at km1 ch26-33.
2.Golupchu Bay road blocked at various stretches due to multiple slides. Restoration works being undertaken.
3.Rest all roads open except FWRs.
Road status ADB Project.
1.Jorethang to Kitam road blocked at 19km & 21km Machine is on the way for clearance Sk01.
2.Jorethang to Namchi road blocked at 3km Machine is on the way for clearance Sk02.
Roads under Gangtok Sub-Division
1.All roads under SD IV is clear for traffic.
Date: 18th August-2023 (06:29 AM)
Road sitrep- 18/08/2023
Kaluk Sub-divison
1.All the roads under kaluk sub division are open except Bermiok Legship road blocked at 8th km ch 33.
Gyalshing Sub-Division
1.Teshangthang-shyangkhola toad blocked at Km 2 ch 13 due formation washout.
2.Rest all the road are open except some of the FWRs.
Singtam Sub-Division
1.All the roads under Singtam Sub-division are clear and trafficable.
Namchi Sub-Division
1.All the roads under Namchi Sub Division are open except Phongla Bermiok road, which is blocked at km 13-14 (Beathghari).
Jorethang Sub-Division
1.All roads under Jorethang Sub-Division are clear for vehicular movement except few FWRs.
Daramdin Sub-Division
1.All roads under Daramdin SD are trafficable.
Ravangla Sub-Division
1.Rayong Tinkitam road blocked at Km 18 due to slide and formation wash out.
2.Chemchay to Lachingthang via Upper Wok road blocked at Km 5 due to formation wash out.
3.Major slide at km 13 Ch 10, Km 13 Ch 12-13-14 and Km 13 Ch 16 Biring Khosla along 10th Mile Turning to Sagbari via Tingmoo Village road…Men and machineries shall be deployed ASAP
4.All other roads are trafficable as of now except some FWR
Yangang Sub-Division
1.Rabongla yangang road is blocked due to slide at pathing.
2.Rest all the road under yangang sub division are open as of now except some of F.W.R.
Dentam Sub-Division
1.All clear except Pelling-Dentam road before BB Lall bridge which is diverted via Liching Golai.
Rongli Sub-Division
1.Pachak to Padamchey via Kamarey road blocked at 3rd km 24th chainage.
2.Bank Dara to Posokey Road Blocked at 1st km.
3.Rolep power House to Navarey Gaon road formation washed out at 1st km.
4.All other roads are trafficable as of now except some FWR.
Pakyong Sub Division
1.Assamlingzey to Pakyong road blocked at KM 23 Ch 15 Rongrong khola.
2.Latuk Thek to Rolep Road closed.
3.Taksang PMGSY road to Koirala Gaon road closed at KM 1,ch 14. Restoration work under progress.
4.Rest all other roads are trafficable as of now, except some Fair Weather Roads.
Soreng Sub-Division
1.All roads under Soreng SD is clear for vehicular movement.
Mangan Sub-Division
1.Phidang sangtok road blocked at km1 ch26-33.
2.Golupchu Bay road blocked at various stretches due to multiple slides. Restoration works being undertaken.
3.Rest all roads open except FWRs.
Road status ADB Project.
1.SH-19 (Jorethang-Manpur road) opened as of now.
2.SH-20 (Jorethang-Namchi road) opened as of now.
Roads under Gangtok Sub-Division
1.Due to incessant rainfall minor slip has occurred at km 10th ch 28th along GRBA road , however the road is trafficable one way.
2.Rest all roads under SD IV is clear for traffic.
Date: 09th August-2023 (06:16 AM)
Road sitrep- 09/08/2023
Kaluk Sub-divison
1.All the roads are open under kaluk sub division except bermiok legship road which is blocked at 8th km ch 32-33.
Gyalshing Sub-Division
1.Teshangthang-shyangkhola toad blocked at Km 2 ch 13 due formation washout.
2.Rest all the road are open except some of the FWRs.
Singtam Sub-Division
1.All the roads under Singtam Sub-division are clear and trafficable.
Namchi Sub-Division
1.Namchi Phongla Namthang Mamring open.
2.Phongla Bermoik road blocked at km 13-14.
3.Chuba Perbing open.
4.Namchi Rong Sumbuk road blocked at km 3 ch33 Lingcham kholsa
4.Namchi Vok road blocked at km 7 ch 23 and Km 12 Silim vir.
5.Namchi Damthang road open.
6.Namchi Assangthang open.
7.Assangthang to Dhargoan road blocked at Km 1ch2.
8. Namch Kitam Manpur fatak open.
Jorethang Sub-Division
1.Namchi-Vok-Sikkip road to omchu school blocked at km 1st, Ch:9
2.Manpur Sumbuk road(Upgradation work in progress)blocked at km 1st CH :8
3.Rest all roads are clear for traffic except FWRs
Daramdin Sub-Division
1.NDP road is clear.
2.Sombaria-Soreng road clear.
3.Sombaria-Hilley, Sombaria-Piureytar, Ribdi-Bhareng , Anden-Tareybhir is clear.
4.Sombaria-Siktam road clear.
5.Salangdang-Rammam road clear.
6.All the above mentioned roads is clear for vehicular movement.
Ravangla Sub-Division
1.Rayong Tinkitam road blocked at Km 18 due to slide and formation wash out.
2.Chemchay to Lachingthang via Upper Wok road blocked at Km 5 due to formation wash out.
3.Road blocked due to felling of tree at Km 4 and Km 7 along Rayong Tinkitam…men and machineries shall be deployed ASAP.
4.All other roads are trafficable as of now except some FWR
Yangang Sub-Division
1.Rabongla yangang road is blocked due to slide at pathing.
2.Rest all the road under yangang sub division are open as of now except some of F.W.R.
Dentam Sub-Division
1.Road blocked at Km-15,Ch-28 along Kaluk-Dentam road near Shivalaya Fatak(Baar Dara) due to uprooting of tree and minor slip.Labour’s are halfway & have instructed for temporary clearance for now .
2.Rest all clear under Dentam Sub-Div provided taking a diversion from Liching via Singshore.
Rongli Sub-Division
1.All roads under Rongli Sub Division is trafficable except Bank Dara to Posokey road , Rolep Power House to Navarey Gaon and some FWR as of now.
Pakyong Sub Division
1.Assamlingzey to Pakyong road blocked at KM 23 Ch 15 Rongrong khola.
2.Latuk Thek to Rolep Road closed.
3.Taksang PMGSY road to Koirala Gaon road closed at KM 1,ch 14. Restoration work under progress.
4.Rest all other roads are trafficable as of now, except some Fair Weather Roads.
Soreng Sub-Division
1.All roads under Soreng SD is clear for vehicular movement.
Mangan Sub-Division
1.Phidang sangtok road blocked at km1ch16-33.
2.Tumlong village road blocked at km1ch1.
3.Rest all roads open except most FWRs.
Road status ADB Project.
1.SH-19 (Jorethang-Manpur road) opened as of now.
2.SH-20 (Jorethang-Namchi road) opened as of now.
Roads under Gangtok Sub-Division
1.All roads under SD IV is clear for traffic.
Date: 04th August-2023 (06:26 AM)
Road sitrep- 04/08/2023
Kaluk Sub-divison
1.All the roads under kaluk sub division are open today.
Gyalshing Sub-Division
1.Teshangthang-shyangkhola toad blocked at Km 2 ch 13 due formation washout.
2.Rest all the road are open except some of the FWRs.
Singtam Sub-Division
1.All the roads under Singtam Sub-division are clear and trafficable except some FWR.
Namchi Sub-Division
1.Namchi Phongla Mamring open.
2.Phongla Bermiok road closed at km 13-14.
3.Chuba Perbing open.
4.Namchi Damthang open.
5.Namchi Rong Sumbuk open.
6.Namchi Kopchey Singithang open.
7.Namchi Vok Sikkip road closed at km 7ch Ch 24-25.
8.Namchi Kitam Manpur Phatak open.
9.Namchi Assangthang open.
10.Assangthang to Dhargoan open.
Jorethang Sub-Division
1.All roads under Jorethang Sub-Division are clear for vehicular movement.
Daramdin Sub-Division
1.NDP road is clear.
2.Sombaria-Soreng road clear.
3.Sombaria-Hilley, Sombaria-Piureytar, Ribdi-Bhareng , Anden-Tareybhir is clear.
4.Sombaria-Siktam road clear.
5.Salangdang-Rammam road clear.
6.All the above mentioned roads is clear for vehicular movement.
Ravangla Sub-Division
1.Rayong Tinkitam road blocked at Km 18 due to slide and formation wash out.
2.Chemchay to Lachingthang via Upper Wok road blocked at Km 5 due to formation wash out.
3.All other roads are trafficable as of now except some FWR.
Yangang Sub-Division
1.Rabongla yangang road is blocked due to slide at pathing.
2.Rest all the road under yangang sub division are open as of now except some of F.W.R.
Dentam Sub-Division
1.Pelling-Dentam blocked at Km-16 due to formation washed out .Diversion from Liching is accessible.
2.Rest all clear for traffic.
Rongli Sub-Division
1.All roads under Rongli Sub Division is trafficable except Bank Dara to Posokey road , Rolep Power House to Navarey Gaon and some FWR as of now.
Pakyong Sub Division
1.Assamlingzey to Pakyong road blocked at KM 23 Ch 15 Rongrong khola.
2.Latuk Thek to Rolep Road closed.
3.Taksang PMGSY road to Koirala Gaon road closed at KM 1,ch 14. Restoration work under progress.
4.Rest all other roads are trafficable as of now, except some Fair Weather Roads.
Soreng Sub-Division
1.All roads under Soreng SD is clear for vehicular movement.
Mangan Sub-Division
1.Phidang sangtok road blocked at km1ch16-33.
2.Tumlong village road blocked at km1ch1.
3.Rest all roads open except most FWRs.
Road status ADB Project.
1.SH-19 (Jorethang-Manpur road) opened as of now.
2.SH-20 (Jorethang-Namchi road) opened as of now.
Roads under Gangtok Sub-Division
1.All roads under SD IV is clear for traffic.
Date: 02nd August-2023 (06:14 AM)
Road sitrep- 02/08/2023
Kaluk Sub-divison
1.All the roads under kaluk sub division are open for traffic flow except Rothok Suntaley Road which is blocked at 1st km ch no 6 due to flash flood.
Gyalshing Sub-Division
1.Teshangthang-shyangkhola road blocked at Km 2 ch 13 due formation washout.
2.Rest all the road are open except some of the FWRs.
Singtam Sub-Division
1.All the roads under Singtam Sub-division are clear and trafficable.
Namchi Sub-Division
1.Namchi Phongla Namthang Mamring blocked near Bhangyang bazar mechine on the way.
2.Phongla Bermoik road closed at km 13-14 Beathghari.
3.Chuba Perbing road open.
4.Namchi Damthang road open.
5.Namchi Rong Sumbuk road blocked.
6.Namchi Vok road blocked at km 7 ch 23.
7.Namchi Kopchay Singhithang road open.
8.Namchi Assangthang road open with minor slip mechine engaged.
9.Assangthang to Dhargoan road open.
10.Namchi Kitam Manpur Phatak open with minor slip.
Jorethang Sub-Division
1.Namchi-Vok-Sikkip road blocked at km 16th, ch:7.
2.Namchi-Vok-Sikkip road to omchu school blocked at km 1st, ch 9th
3.Melli turuk sadam Bhanjyang road blocked at km 1st ch1st Majigaon.
4.Melli Turuk Sadam Bhanjyang road blocked at km 7th ch 13 Turuk.
5.Melli Phong road blocked at km 9th
6.Melli bazaar Approach road blocked at km 1st ch 9th
7.Passi katang to Namthang blocked at km 12 ch 30 , km 14th ch 12
8.Rest are all open and most FWRs are blocked.
Daramdin Sub-Division
1.NDP road has been blocked at km9 due to flash flood and also at km8 ch23-24 due to fallen tree.
2.Sombaria-Soreng road-A minor slip has occurred at km4 ch 30.only trafficable for LMV but closed for HMV.
3.Sombaria-Hilley Sombaria-Piureytar Ribdi-Bhareng and Anden-Tareybhir road is clear for vehicular movement.
4.Sombaria-Siktam, Salangdang-Rammam is clear too
Ravangla Sub-Division
1.Rayong Tinkitam road blocked at Km 18 due to slide and formation wash out.
2.Chemchay to Lachingthang via Upper Wok road blocked at Km 5 due to formation wash out.
3.All other roads are trafficable as of now except some FWR.
Yangang Sub-Division
1.Rabongla yangang road is blocked due to slide at pathing.
2.Rest all the road under yangang sub division are open as of now except some of F.W.R.
Dentam Sub-Division
1.Pelling-Dentam blocked at Km-16 due to formation washed out .Diversion from Liching is accessible.
2.Rest all clear for traffic.
Rongli Sub-Division
1.All roads under Rongli Sub Division is trafficable except Bank Dara to Posokey road , Rolep Power House to Navarey Gaon and some FWR as of now.
Pakyong Sub Division
1.Assamlingzey to Pakyong road blocked at KM 23 Ch 15 Rongrong khola.
2.Latuk Thek to Rolep Road closed.
3.Taksang PMGSY road to Koirala Gaon road closed at KM 1,ch 14. Restoration work under progress.
4.Rest all other roads are trafficable as of now, except some Fair Weather Roads.
Soreng Sub-Division
1.Chakung Khanesirbong road blocked at KM 7th ch 2 .
2.NDP road to Chakung via Chumbung blocked at KM 3rd ch 15 and KM 11 ch 7.
3.Rest of roads are trafficable.
Mangan Sub-Division
1.Phidang sangtok road blocked at km1ch16-33.
2.Tumlong village road blocked at km1ch1.
3.Rest all roads open except most FWRs.
Road status ADB Project.
1.Jorethang to kitam fatak road open SK01.
2.Jorethang to Namchi road block at 18km.
Roads under Gangtok Sub-Division
1.All roads under SD IV is clear for traffic.
Date: 10th July-2023 (06:19 AM)
Roadsitrep- 10/07/2023
Kaluk Sub-divison
1.All the roads under Kaluk sub division are open.
Gyalshing Sub-Division
1.Tashangthang to Shyangkhola road blocked at Km 2 ch 13 due to formation washout.
2.Rest all the road are open except some of the FWRs.
Singtam Sub-Division
1.All the roads under Singtam Sub-division are clear and trafficable.
Namchi Sub-Division
1.Namchi Phongla Namthang Mamring open.
2.Phongla Bermoik road blocked at km 13-14.
3.Chuba Perbing open.
4.Namchi Damthang open.
5.Namchi Rong Sumbuk open.
6.Namchi Vok Sikkip road closed at km 7ch 24.
7.Namchi Kopchay Singhithang open.
8.Namchi Assangthang open.
9.Assangthang Dhargoan open.
10. Namchi Kitam Manpur fatak open.
Jorethang Sub-Division
1.All road under Jorethang SD is open except some FWR.
Daramdin Sub-Division
1.All roads under Daramdin SD are trafficable as of now.
Ravangla Sub-Division
1.Rayong Tinkitam road blocked at Km 18 due to formation wash out and major slips at various stretches.
2.All other roads are trafficable as of now except some FWR.
Yangang Sub-Division
1.Rabongla yangang road is blocked due to slide at pathing.
2.Rest all the road under yangang sub division are open as of now except some of F.W.R.
Dentam Sub-Division
1.Pelling-Dentam blocked at Km-16 due to formation washed out .Diversion from Liching is accessible.
2.Rest all clear for traffic.
Rongli Sub-Division
1.Bank Dara to Posokey Road Blocked at km 1 , Ch 1st and Ch 2nd.
2.Rolep Power House to Navarey Gaon formation was out at km 1, Ch 11th and 12th
3.All other roads are trafficable as of now except some FWR.
Pakyong Sub Division
1.Assamlingzey to Pakyong road blocked at KM 23 Ch 15 Rongrong khola.
2.Latuk Thek to Rolep Road blocked.
3.Taksang PMGSY road to Koirala Gaon road closed at KM 1,ch 14.
4.Rest all other roads are trafficable as of now, except some Fair Weather Roads.
Soreng Sub-Division
1.All roads under Soreng SD are open for traffic.
Mangan Sub-Division
1.Phidang sangtok road blocked at km1ch16-33.
2.Tumlong village road blocked at km1ch1.
3.Rest all roads open except most FWRs.
Road status ADB Project.
1.SH-19 (Jorethang-Manpur road) opened as of now.
2.SH-20 (Jorethang-Namchi road) opened as of now.
Roads under Gangtok Sub-Division
1.All roads clear for traffic except for Nandok Rizey road under Gangtok sub division
Date: 06th July-2023 (06:28 AM)
Road sitrep- 06/07/2023
Kaluk Sub-divison
1.All the roads under Kaluk sub division are open except bermiok legship road which is blocked again at Rangsang dovan road at 2nd km chb16-18.
2.Reshi Rinchenpong road at Takuthang which is likely to open today for LMV.
Gyalshing Sub-Division
1.Tashangthang to shyangkhola road blocked at Km 2 ch 13 due to formation washout
2.Rest all the road are open except some of the FWRs.
Singtam Sub-Division
1.All the roads under Singtam Sub-division are clear and trafficable.
Namchi Sub-Division
1.Namchi Phongla Namthang Mamring road open.
2.Phongla Bermoik road closed at km 13-14.
3.Chuba Perbing road open.
4.Namchi Damthang road open.
5.Namchi Rong Sumbuk road open.
6.Namchi Kopchey Singithang open.
7.Namchi Vok Sikkip road blocked at km 7ch 24.
8.Namchi Kitam Manpur fatak open.
Jorethang Sub-Division
1.All roads under Jorethang sub division is trafficable except some FWR.
Daramdin Sub-Division
1.All roads under Daramdin SD are trafficable as of now.
Ravangla Sub-Division
1.All roads under Rabong Sub Division are trafficable as of now except some FWR.
Yangang Sub-Division
1.Rabongla yangang road is blocked due to slide at pathing.
2.Rest all the road under yangang sub division are open as of now except some of F.W.R.
Dentam Sub-Division
1.All clear as of now except Pelling Dentam which is accessible via Liching Golai .
Rongli Sub-Division
1.Bank Dara to Posokey road blocked at Ch 1st.
2.Rolep to Navarey Goan formation wash out at 1st km.
3.Kopchey to Nirmal Dham road blocked at 2km.
4.Duga Pacheykhani road trafficable for light vehicles.
5.All other roads are trafficable as of now except some FWR.
Pakyong Sub Division
1.Assamlingzey to Pakyong road blocked at KM 23 Ch 15 Rongrong khola.
2.Latuk Thek to Rolep Road blocked.
3.Taksang PMGSY road to Koirala Gaon road closed at KM 1,ch 14.
4.Pakyong Machong Rolep Chujachen Rongli road blocked and formation washed out at KM 19,ch 7.
5.Brapathing Pheri to Zilling road formation partially washed out at KM 3,ch 16. However, the road is trafficable for light motor vehicles. 6) Tshalamthang Mamring Tareythang Rorathang Road blocked at KM 4 ch 30.
6.Rest all other roads areRest all other roads are trafficable as of now, except some Fair Weather Roads.
Soreng Sub-Division
1.Road blocked at KM 2nd Baingtar RF along NDP road.
2.Chakung Khaniserbong road blocked at KM 9 ch 8th.
3.Chottasamdong Mazuwa road blocked at KM 1st ch 24.
4.Minor Slips occurred along Soreng Kaluk road and Soreng Chakung road .Manpower engaged for clearance.
5.Rest of roads under Soreng SD are open as of now
Mangan Sub-Division
1.Phidang sangtok road blocked at km1ch16-33.
2.Tumlong village road blocked at km1ch1.
3.Rest all roads open except most FWRs.
Road status ADB Project.
1.SH-19 (Jorethang-Manpur road) opened as of now.
2.SH-20 (Jorethang-Namchi road) opened as of now.
Roads under Gangtok Sub-Division
1.All roads clear for traffic except for Nandok Rizey road under Gangtok sub division
Date: 04th July-2023 (06:04 AM)
Road sitrep- 04/07/2023
Kaluk Sub-divison
1.Sreebadam mangalbarey road open with minor slip occurrence at 8th km ch 21
2.Bermiok legship road blocked at 12th km ch 6, at Feng Khosla 17th km ch 32-33 and at Ghungrungey 8th km ch 23.
4.Road leading to gayabari is bermiok to gayabari is open.
5.Reshi rinchenpong road blocked at 9th km chb20. Remaining all roads are open.
Gyalshing Sub-Division
1.Chongrang kongri labdang - blocked at km 17 ch no 21-22
2.Relli khola -Phamtam road blocked at Km 3 ch 30
3.Tashangthang to shyangkhola road blocked at Km 2 ch 13 due to formation washout.
4.Yaksam-Tashiding road blocked at Km 11 ch 3.
5.Rest all the road are open except some of the FWRs.
Singtam Sub-Division
1.All roads under Singtam Sub-division are clear and trafficable.
Namchi Sub-Division
1.Namchi Phongla Namthang Mamring road open.
2.Phongla Bermiok fatak road blocked at ghari km 13 -14.
3.Chuba Perbing road open.
4.Namchi Damthang road open.
5 Namchi Vok Sikkip road blicked at km 7 ch 24 due to formation damaged.
6.Namchi Kopchey Singithang open.
7.Namchi Rong Sumbuk open.
8.Namchi Manpur fatak open.
9.Namchi Assangthang open.
10. Assangthang to Dhargoan open.
Jorethang Sub-Division
1.All roads under Jorthang sub division is open except few FWR
Daramdin Sub-Division
1.NDP road blocked at km 9th and 17th . Machine on the way for clearance.
2.Rest all roads are trafficable as of now except FWRS
Ravangla Sub-Division
1.Road has now been made trafficable at Km 9 Ch 18 along 10th Mile Turning to Sagbari via Tingmoo Village road under Rabong Sub Division in Namchi District.
2.Rest of the roads under Rabong Sub Division are open as of now except some of the FWR.
Yangang Sub-Division
1.Rabongla Yangang road is blocked due to slide at pathing.
2.Rest all the road under Yangang sub division are open as of now except some of F.W.R.
Dentam Sub-Division
1.Pelling-Dentam blocked at Km-16 due to formation washed out .Diversion via Litching Golai is trafficable.
2.Kaluk-Dentam blocked at Km-15,Ch-12 due to accumulated slush.Labours will be engaged at earliest for clearance
3.Dentam -Uttarey clear for LMV’s.Permanent restoration at km-4 is in progress.
4.Intake -Jhakridhunga road clear
5.Litching Gyaten clear
6.Approach road to SPWD/BAC/SDM ofic clear
Rongli Sub-Division
1.Duga Pacheykhani road blocked 1st km Ch 25,
2.Bank Dara to Posokey road blocked at Ch 1st
3.Rolep to Navarey Goan formation wash out at 1st km
4.Kopchey to Nirmal Dham road blocked at 2km
5.All other roads are trafficable as of now except some FWR
Pakyong Sub Division
1.Assamlingzey to Pakyong road blocked again at KM 23 Ch 15 Rongrong khola.
2.Latuk Thek to Rolep Road blocked.
3.Setipool to Assamlingzey road temporarily blocked due to uprooting of tree. Manpower has been engaged to clear the road immediately.
4.Rest all other roads are trafficable as of now, except some Fair Weather Roads.
Soreng Sub-Division
1.Road blocked at KM 2nd Baingtar RF along NDP road.
2.Chakung Khaniserbong road blocked at KM 9 ch 8th.
3.Chottasamdong Mazuwa road blocked at KM 1st ch 24.
4.Minor Slips occurred along Soreng Kaluk road and Soreng Chakung road .Manpower engaged for clearance.
5.Rest of roads under Soreng SD are open as of now
Mangan Sub-Division
1.Phidang sangtok road blocked at km1ch16-33.
2.Tumlong village road blocked at km1ch1.
3.Rest all roads open except most FWRs.
Road status ADB Project.
1.SH-19 (Jorethang-Manpur road) opened as of now.
2.SH-20 (Jorethang-Namchi road) opened as of now.
Roads under Gangtok Sub-Division
1.All roads clear for traffic except for Nandok Rizey road under Gangtok sub division